Louis Ohland wrote: http://ps-2.kev009.com/ohland/8590/Testing_90_Power_Supply.html
There was a recent launch excursion. It drove home the importance of attaching your test leads to the correct conductors.
Being a visual guy, I modified some existing images [without AI, I might
add] and included the test values inside the test attachment illustrations.
I need to turbo-diddle a wee bit more and add (+) and (-) next to the
lead attachment points.
Comments will be either incorporated or blithely ignored.
Louis Ohland wrote:
http://ps-2.kev009.com/ohland/8590/Testing_90_Power_Supply.html
There was a recent launch excursion. It drove home the importance of
attaching your test leads to the correct conductors.
Being a visual guy, I modified some existing images [without AI, I might
add] and included the test values inside the test attachment
illustrations.
I need to turbo-diddle a wee bit more and add (+) and (-) next to the
lead attachment points.
Comments will be either incorporated or blithely ignored.
Thanks Louis!
This response appears in the discussion at: http://www.jlaforums.com/viewtopic.php?p=705420915#705420915
| Sysop: | DaiTengu |
|---|---|
| Location: | Appleton, WI |
| Users: | 1,124 |
| Nodes: | 10 (0 / 10) |
| Uptime: | 24:40:39 |
| Calls: | 14,394 |
| Calls today: | 3 |
| Files: | 186,389 |
| D/L today: |
6,194 files (1,561M bytes) |
| Messages: | 2,545,009 |
| Posted today: | 1 |